
Hamilton, Bermuda
BELCO Power Station
New-build 60MW heavy oil power station.
Process pipework · Steel, power generation & heavy industry · Scunthorpe

Specialists in process pipework, carbon and stainless steel fabrication, coded welding and site installation for the steel, power generation, chemical, pharmaceutical and food manufacturing industries.
Coded welders
TIG and coded welding on carbon and stainless process lines.
First trade on site
The plant cannot start up until the pipework is in and tested.
Power-gen grade
Fire mains and suppression built to code on live power stations.
KBVI has been the pipework contractor on steelworks and power-stations who cannot afford a weld to fail. The company names here are real work references and case studies. Click on one to see more details.
When BWSC needed a new-build biomass power station piped, KBVI was first trade on site and stayed for two years, through fire mains, process lines and final test.

biomass plant, piped through the whole build
Every fact here comes from KBVI's own job record. No stock, no renders.
Six disciplines, one crew. KBVI has stood on every job on this list, so the scope is what it says and nothing is farmed out that should not be.


The same crew and the same standard across steel, power, process and heavy industry, on sites at home and overseas.
Read the drawings, walk the site, plan access and set out the runs before anything is cut.
Spools fabricated in carbon or stainless, small bore to large diameter, ready to drop in.
Runs installed to line and level on live sites, working around the other trades, not through them.
TIG and coded welding, then pressure test and inspection so the plant can be signed off.
Snag, mark up and hand the system over clean, with the pipework in and proven.
References from the jobs below are available on request. We would rather show you the pipework and the people than a wall of five-star graphics.
Hamilton, Bermuda
New-build 60MW heavy oil power station.
Read the jobSandwich, Kent
New-build 27.8MW biomass power station.
Read the jobSheffield
Furnace cooling and HVAC pipework.
Read the jobBritish Steel, Scunthorpe
Clarifier pump pipework, 3 inch and 2.5 inch carbon steel sch40.
Read the jobBritish Steel, Scunthorpe
Ammonia still to low level pit pipework replacement.
Read the jobBritish Steel, Scunthorpe
Pipework and valve installation inside a plant shutdown window.
Read the jobFire mains and process lines built to code on live plants for main contractors who cannot afford a failure.
Often the first trade on site and one of the last, because nothing starts up until the pipework is tested.
Based in Scunthorpe, mobilised anywhere. British Steel on the doorstep and at Lackenby Works in Middlesbrough, plus Sheffield, Kent and Bermuda on the record.
If there is pipework to fabricate, install, weld or test, KBVI travels to it. These are jobs already on the record.
The things main contractors and site managers ask most often.
Stainless and carbon steel fabrication, process lines, fire hydrant lines and suppression, HVAC, and the full run of plant lines: ammonia, demin, cooling water, steam, oil, hydraulic and argon. Small bore up to large diameter.
Yes. TIG and coded welding on carbon and stainless process and cooling lines, including furnace pipework for Rolls-Royce. Welds are pressure tested and inspected before sign-off.
Regularly. Much of the work is on running plants and live power-station builds, fitted in alongside whoever else is on site. On refits we strip out and refit existing plant while the site keeps operating.
KBVI is based in Scunthorpe and mobilises anywhere. Jobs already on the record run from the steelworks on the doorstep to Sheffield, Sandwich in Kent and Hamilton in Bermuda.
Email office@kbvipipework.co.uk with the scope, the site and the programme, or call the office on 01724 622120. The reply comes from the people who price the job and stand on the site.
Send the scope, the site and the programme. You get a straight answer from the people who do the work, not a call centre.
One email and the pipework starts moving. Your job gets priced by the crew that welds it and stands on the site from first spool to final test.