Job 02 / 6 / BWSC · 2017
Discovery Park
Sandwich, Kent
New-build 27.8MW biomass power station
Discovery Park in Sandwich is a new-build 27.8MW biomass power station, and KBVI went in for BWSC before any other work could start. The job opened with fire mains and fire suppressant systems. KBVI ran the pipework on site and installed it, prefabricating to drawings and site running the rest. The crew then stayed for two years and worked nearly every pipeline in the plant: ammonia, demin water, cooling water, steam, oil, hydraulic, and the argon fire suppressant lines.
- 01Fire mains and fire suppressant systems
- 02On site before any other work could start
- 03Prefabrication and installation to drawings, then site run
- 04Ammonia, demin water, cooling water and steam lines
- 05Oil, hydraulic and argon fire suppressant lines
From the job
24 frames · KBVI's own photographs · no stock, no renders