Job 01 / 6 / BWSC · 2019
BELCO Power Station
Hamilton, Bermuda
New-build 60MW heavy oil power station
BWSC brought KBVI out to Hamilton to put in every fire main on the BELCO power station, a new-build 60MW heavy oil plant that came online in 2019. The crew fabricated and installed the lot. External fire hydrants around the site, internal fire hose connection points inside the buildings, and fire suppressant systems, including the sets protecting the electrical gear and the transformers. The red-coated main on the homepage was run on this job.
- 01Fabrication and installation of all fire mains on site
- 02External fire hydrants
- 03Internal fire hose connection points
- 04Fire suppressant systems on electrical systems and transformers
From the job
19 frames · KBVI's own photographs · no stock, no renders