Capability 06 / 06 / Outages and refits

Plant refit and outage pipework on running steelworks and process sites.

Stripping out and refitting existing plant on live sites, including clarifier pipework replacement and pipework and valve installation inside a shutdown window at British Steel, Scunthorpe.

Plant removal, refit and outage pipework

Refit work has one hard constraint: the plant is running, or it is down for a window that will not move. KBVI strips out and refits existing pipework on live sites and inside shutdowns, planned so the site keeps operating or restarts on the day it was meant to.

On the record at British Steel, Scunthorpe: the BOS plant clarifier, where the clarifier pump pipework in 3 inch and 2.5 inch carbon steel schedule 40 was removed and replaced, and the BOS plant July 2026 outage, where pipework and valves were installed inside the shutdown window. On a coke oven ammonia still, the pipework from the still to the low level pit was replaced. Scunthorpe is home; the steelworks is on the doorstep.

Contact us
  • On the record

    BOS plant clarifier and BOS plant July 2026 outage, British Steel, Scunthorpe

  • Also

    Coke oven ammonia still to low level pit pipework replacement

  • Constraint

    Live sites and fixed shutdown windows

  • Base

    Scunthorpe, with the steelworks on the doorstep

What refit work covers.

  • 01Stripping out existing pipework and plant
  • 02Clarifier pipework removal and replacement
  • 03Pipework and valve installation inside outage windows
  • 04Replacement of failed or life expired process lines
  • 05Tie-ins to running plant
  • 06Complete process line refits on live sites

How the job runs.

  1. Survey

    Walk the plant, read what is there against the drawings, and agree what the window allows.

  2. Prefabricate

    Everything that can be made before the shutdown is made before the shutdown.

  3. Strip out

    Existing pipework and plant removed cleanly, within the window.

  4. Refit and prove

    New pipework and valves installed, welded and proven for restart.

  5. Handover

    Plant handed back on the programme, marked up, with the pipework in and proven.

Where we work

Based in Scunthorpe. Mobilised anywhere.

Plant removal, refit and outage pipework from a base in Scunthorpe, with British Steel on the doorstep, across Scunthorpe, Grimsby, Immingham, Hull, Goole, Doncaster, Sheffield and Lincoln, the Humber and Yorkshire, and wherever the job is. Lackenby Works in Middlesbrough, Sheffield, Sandwich in Kent and Hamilton in Bermuda are on the record.

  • →Scunthorpe
  • →Grimsby
  • →Immingham
  • →Hull
  • →Goole
  • →Doncaster
  • →Sheffield
  • →Lincoln

Straight answers.

What buyers ask about plant removal, refit and outage pipework.

Can you work inside a shutdown window?

Yes. The BOS plant July 2026 outage at British Steel was pipework and valve installation inside the shutdown window, with prefabrication done beforehand so the window was spent installing.

Do you strip out as well as install?

Yes. Existing plant is stripped out and refitted on running sites, from clarifier pipework to complete process lines.

How quickly can you be on site in Scunthorpe?

KBVI is based in Scunthorpe. For a plant on the doorstep, send the scope and the window and the office will come back with the people who will do the job.

Send the drawings.
Get a straight answer.

One email and the pipework starts moving. Your job gets priced by the crew that welds it and stands on the site from first spool to final test.