New pipework and a blue gearbox pump refitted in the underground service duct on the BOS plant at British Steel

Job 04 / 6 / British Steel

BOS Plant Clarifier

British Steel, Scunthorpe

3inch

Clarifier pump pipework, 3 inch and 2.5 inch carbon steel sch40

RemovalSite runCarbon steel sch40

On the BOS plant at British Steel in Scunthorpe, the clarifier pump pipework had gone damaged and blocked. KBVI took it out, took its own dimensions off the site, and fabricated the replacement in 3 inch and 2.5 inch carbon steel sch40 before installing the lot. The photos follow the work underground, from the old pipework still in place through to the new lines made off to the pumps.

  • 01Removal of the existing damaged and blocked pipework
  • 02All dimensions taken on site by KBVI
  • 03New pipework site run and fabricated on site
  • 04Installation of all new pipework in 3 inch and 2.5 inch carbon steel sch40

From the job

7 frames · KBVI's own photographs · no stock, no renders

Existing damaged pipework above the pump in the underground chamber before removal
The old encrusted pipework runs feeding the clarifier pump
Underground service duct running toward the refitted pump and valve station
The chamber cleared, with the pump set standing ready under the lifting beam
Close-up of a blue pump and gearbox unit connected into the clarifier pipework
Pump and pipework in the chamber during the changeover
New pipework installed and connected up in the chamber