Job 04 / 6 / British Steel
BOS Plant Clarifier
British Steel, Scunthorpe
Clarifier pump pipework, 3 inch and 2.5 inch carbon steel sch40
On the BOS plant at British Steel in Scunthorpe, the clarifier pump pipework had gone damaged and blocked. KBVI took it out, took its own dimensions off the site, and fabricated the replacement in 3 inch and 2.5 inch carbon steel sch40 before installing the lot. The photos follow the work underground, from the old pipework still in place through to the new lines made off to the pumps.
- 01Removal of the existing damaged and blocked pipework
- 02All dimensions taken on site by KBVI
- 03New pipework site run and fabricated on site
- 04Installation of all new pipework in 3 inch and 2.5 inch carbon steel sch40
From the job
7 frames · KBVI's own photographs · no stock, no renders