Capability 04 / 06 / Plant lines
HVAC and process pipework: demin, cooling, steam, oil, hydraulic and argon.
Threaded and welded HVAC pipework alongside the full run of plant process lines, installed on running sites and new builds.

A plant is a set of lines. Demin water, cooling water, steam, oil, hydraulic, ammonia and argon each have their own material, routing and connections, and on a working site they all have to go in around each other and around whoever else is there. KBVI runs them as one package, threaded and welded, with the HVAC pipework alongside.
At Discovery Park in Kent that meant nearly every pipeline in the plant over two years. At Rolls-Royce in Sheffield it was furnace cooling and HVAC pipework in stainless. The same lines run through biomass plants, steelworks, petro-chem sites and fuel handling.
Contact usLines
HVAC, demin, cooling, steam, oil, hydraulic, ammonia, argon
Materials
Carbon and stainless steel, threaded and welded
On the record
Discovery Park (two years, nearly every line) and Rolls-Royce (furnace cooling and HVAC)
Where
Steelworks, power stations, biomass, petro-chem, food and pharma
Lines we run.
- 01HVAC pipework, threaded and welded
- 02Demin water and cooling water lines
- 03Steam and condensate pipework
- 04Oil and hydraulic process lines
- 05Ammonia lines
- 06Argon lines
- 07Furnace cooling pipework
- 08Connections into existing plant
How the job runs.
Survey and set out
Drawings read, routes walked, clashes found before they are built.
Fabricate
Spools in carbon or stainless to suit each line.
Install
Each line run to line and level, sequenced with the other trades.
Weld and prove
Welded, checked and proven line by line.
Handover
Marked up and handed over with the lines in and proven.
On the record.
The jobs behind this page, with KBVI's own photographs.
Based in Scunthorpe. Mobilised anywhere.
HVAC and process pipework from a base in Scunthorpe, with British Steel on the doorstep, across Scunthorpe, Grimsby, Immingham, Hull, Goole, Doncaster, Sheffield and Lincoln, the Humber and Yorkshire, and wherever the job is. Lackenby Works in Middlesbrough, Sheffield, Sandwich in Kent and Hamilton in Bermuda are on the record.
- →Scunthorpe
- →Grimsby
- →Immingham
- →Hull
- →Goole
- →Doncaster
- →Sheffield
- →Lincoln
Straight answers.
What buyers ask about hvac and process pipework.
Can you take the whole process package?
Yes. On power generation projects KBVI takes full process pipework packages for EPC contractors, from setting out to handover.
Do you do threaded pipework as well as welded?
Yes. HVAC pipework is threaded and welded as the spec requires, alongside the welded process lines.
What about connecting into plant that is already running?
That is most of the work. Lines are tied into existing plant on live sites, planned around the operator's programme.
Also on the list.
Pipework fabrication and installation
Spool fabrication and site installation of process pipework in carbon and stainless steel, small bore up to large diameter, on live plants and new builds.
Stainless steel pipework and welding
TIG welding on stainless process and cooling lines, including furnace pipework for Rolls-Royce in Sheffield, and hygienic stainless for pharmaceutical and food plant.
Plant removal, refit and outage pipework
Stripping out and refitting existing plant on live sites, including clarifier pipework replacement and pipework and valve installation inside a shutdown window at British Steel, Scunthorpe.
Or call the office on 01724 622120 or email office@kbvipipework.co.uk.
Send the drawings.
Get a straight answer.
One email and the pipework starts moving. Your job gets priced by the crew that welds it and stands on the site from first spool to final test.